On-Going Projects - Lopez Tower& Museum

 

Project Details

  • Project Name : Lopez Tower and Museum
    • Package No. 101 – Main Contract Works
  • Project Location : Block 9, Rockwell Center, Makati City
  • Project Owner : Rockwell Land Corporation
  • Architect : Pimentel, Rodriguez, Sibulan & Partners (PRSP)
  • Floor Area : 52,114 sq.m.

Performance Period

  • Date of Award and Contract Date – 07 January 2013
  • Possession of Site and Commencement of the Works – 07 January 2013
  • Completion of Structural Works:
    • Original Schedule: 14 March 2014
    • Revised Schedule/ Rev 01:  27 May 2014
    • Revised Schedule/ Rev 02:  31 July 2014

Milestone Dates (Overall)

  • NTP for General Contractor : 07 January 2013
  • Start of Structural Works : 08 February 2013
  • Erection of Tower Crane : 08 February 2013
  • MEPF NSC Notice to Proceed : 15 February 2013
  • Energy Center Room Readiness : 28 February 2014
  • Preparation of Offices Drawings/Coordination with PMT : 31 March 2014
  • Building Management System : 14 April 2014
  • Energy Center-Equipment Delivery : 30 April 2014
  • VRF & FCU : 01 May 2014
  • Topping Off : 31 July 2014
  • Power On : 17 July 2014
  • Water On : 25 August 2014
  • Curtain Wall Completion : 08 September 2014
  • Fit-Out Contractor : 30 September 2014
  • Building Water Tightness : 18 September 2014
  • Elevator/ Escalator Readiness : 15 November 2014
  • Project Completion : 15 December 2014
  • Dismantling of Tower Crane : 17 June - 10 August 2014
  • Gondola : 03 July – 31 August 2014
  • Testing & Commissioning : \30 July – 30 November 2014

Scope of Works

  • General Requirements and Preliminaries
    • Permits
    • Bonds and InsuranceManagement & Supervision
    • Drawings & Submission
    • Material Testing
    • Security/ Safety/ Protection
    • Phased/ Sectional Completion
    • Temporary Works
    • Temporary Construction Equipment
    • LEED Requirement
  • Structural Works
    • OSM (Cement & Rebar)
    • Earthmoving
    • Soil Treatment
    • Damp roofing & Waterproofing
    • Formworks System
    • Rebar Works
    • Concrete Works
    • Structural Steel Works
  • Architectural Works
    • Masonry Works
    • Drywall Partition
    • Metal Doors & Frames
    • Wood Doors & Frames
    • Door Hardwares (Fix Only)
    • Metal Windows
    • Steel Louvers
    • Waterproofing Works
    • Tiles (Fix Only)
    • Suspended Gypsum Ceiling
    • Toilet Fixtures (Fix Only)
    • Metal Fabrication (stainless steel ladder rung, nosing, balustrades, steel gratings)
    • Pre-cast concrete (wheel stop)
  • Plumbing Works (Substructure)
  • MEPF’s Embeds, Block-outs and Sleeves (Substructure)
  • Prime Cost (Attendance Fee)
    • Plumbing Works – ICPW
    • Electrical Works – Fastech/ Robros
    • Fire Protection – RF De Guia
    • Curtain Wall - Permasteelisa

Project Status as of September 14, 2014

  • Physical Progress Report as of September  25, 2014:
    • Cumulative Planned     = 54.96%
    • Cumulative Actual     = 70.76%
    • Variance     = 15.80%         
    • Equivalent days    = 51.50days (advance)
  • Concrete Poured at Stair @ RD-01 to Machine Room (09-13-14)
  • Concrete Poured at RC wall @ RD-01 to Machine Room  - (09-13-14)
  • Concrete Poured at Stair @  Machine Room to RD-02 (09-17-14)
  • Concrete Poured at RC wall @ Machine Room to RD-02 (09-17-14)
  • Concrete Poured at Planted Columns to RD-01 (09-18-14)
  • Masonry Works at GF-20F
  • Ongoing installation of steel doors @ basement levels and at EE rooms (core area)
  • Ongoing installation of railings @  fire exit stairs (third floor level)

    Statistics Report: Cumulative Man-hour = 3,155,505
    • Days Elapse = 620
    • Days Remaining = 77
       

 

On-Going
lopez_00
lopez_00
Image Detail Image Download
lopez_140914_01
lopez_140914_01
Image Detail Image Download
lopez_140914_02
lopez_140914_02
Image Detail Image Download
lopez_140914_03
lopez_140914_03
Image Detail Image Download

 

Display Num