On-Going Projects - QC Museum

Project Details

  • Project Name : Design and Construction Of Quezon City Museum
    • Phase 1, Phase 2 and Phase 3
  • Project Location : Quezon City Memorial Circle, Quezon City
  • Project Owner : Quezon City Government
  • Floor Area : 6,229.21 square meters

Performance Period

  • Date of Award and Contract Date (Phase 1) - 02 January 2012
  • Date of Award and Contract Date (Phase 2) - 13 March 2013
  • Date of Award and Contract Date (Phase 3) – 07 March 2014
  • Possession of Site and Commencement of the Works - 02 January 2012
  • Contract Completion (Phase 1) – 03June2013  w/ suspension order
  • Contract Completion (Phase 2) – 10 June 2014
  • Contract Completion (Phase 3) – 25 February 2015

Milestone Dates

  • Start of Excavation (Phase 1) - 02 January 2012
  • Start of Excavation (Phase 2) - 01April  2013
  • Start of Excavation (Phase 3) – 10 January  2014
  • Permanently Water Supply Available – October 2013 (By Owner)
  • Building Fully Water Tight –April 2014
  • Start of Testing and Commissioning – Awaiting Permanent Power Supply (By Owner)
  • Start of Hand-Over –April 2014

Scope of Works

Design, build and provide manpower, materials, tools, equipment, supervision and expertise and all other services for the satisfactory performance to carry out and bring to completion the works in accordance with the “Scope of Works” as follows:

  • Engineering Design Drawings (Architectural, Structural, Sanitary/Plumbing, Fire-Protection, Electrical and Mechanical)
  • Site works (Excavation and Backfilling)
  • Structural Works (Rebar, Formworks and Concrete)
  • Architectural Works and Specialty Works (Masonry, Wall Finishes, Ceiling Finishes, Toilet and Kitchen Finishes, Roof Skylight, Fabricated Materials and Miscellaneous Metals)
  • Electrical Works
  • Sanitary and Plumbing Works
  • Fire-Protection Works
  • Mechanical Works

Project Status as of September 1, 2014

The overall accomplishment of the project for Phases 1, 2 and 3 are 100%, 94.47% and 93.38% respectively which includes General Requirements, Structural/Civil Works, Architectural and MEPF works with a running total of 936920 man-hours without any loss time accident.

 

On-Going
qcmuseum_01
qcmuseum_01
Image Detail Image Download
qcmuseum_140901_01
qcmuseum_140901...
Image Detail Image Download
qcmuseum_140901_02
qcmuseum_140901...
Image Detail Image Download
qcmuseum_140901_03
qcmuseum_140901...
Image Detail Image Download
qcmuseum_140901_04
qcmuseum_140901...
Image Detail Image Download
qcmuseum_140901_05
qcmuseum_140901...
Image Detail Image Download
qcmuseum_140901_06
qcmuseum_140901...
Image Detail Image Download
qcmuseum_140901_07
qcmuseum_140901...
Image Detail Image Download
qcmuseum_140901_08
qcmuseum_140901...
Image Detail Image Download
qcmuseum_140901_09
qcmuseum_140901...
Image Detail Image Download
qcmuseum_140901_10
qcmuseum_140901...
Image Detail Image Download

 

Display Num