On-Going Projects - Thomasian Alumni Center

 

Project Details

  • Project Name
    A. General Construction and Trade Works of Thomasian Alumni Center
    B. General Construction and Trade Works of Thomasian Alumni Center Ph. 2
    C. General Construction and Trade Works of Thomasian Alumni Center Ph. 3 (12 Storey Bldg. w/ Roof Deck)
  • Project Location
    UST Compound, EspaƱa, Manila City
  • Project Owner
    University of Sto. Thomas

Performance Period

  • Date of Award and Contract Date – 15 July 2011
  • Possession of Site and  Commencement of the Works – 15 July 2011
  • Contract Completion – 30 June 2014

Scope of Works

Provide Manpower, tools and equipment, supervision and expertise and all other services for the satisfactory performance and to carry out and bring to completion the works in accordance with the “Scope of Works” as follows:

  • Site Works (Sheet Pile for Cistern Tank Only, Earthworks, Cutting of Board Piles, Soil Poisoning, Dam proofing and Restoration of Concrete Pavement)
  • Civil/Structural  Works (Concrete Formworks, Concrete Reinforcement and Cast-in Place Concrete)
  • Architectural Works (Masonry Works, Floor Finishes, Ceiling Finishes, Toilet and Kitchen Finishes, Stair and Ramp Finishes, Roofing Works, Waterproofing Works, Fabricated Materials, Wall Finishes, Miscellaneous Metals and Specialty Works [Canopy Finishes, Railings and Tubular Louver] and Painting Works).
  • Electrical Works (Main and Sub-feeder Distribution System, Power System, Lighting System, Grounding System, Lightning Protection and Auxiliary System)
  • Mechanical Works (Ventilating Equipment, Refrigerant Piping Works and Ventilating Ductworks)
  • Sanitary and Plumbing Works (Cold Water Line System, Fixtures, Storm Drainage System, Sewer Line System and Vent Line System)
  • Fire Protection System (Heads, Riser, Feed Main, Auxiliary, Drains, Riser, Cross main, Dry Stand Pipes, Branch lines and Pump and Motors.

Project Status as of July 30, 2014

Total accomplishment of the project:

  • Phase 1 – 100.00%
  • Phase 2 – 99.23%
  • Phase 3 – 95.03%

 

On-Going
thomasian_00
thomasian_00
Image Detail Image Download

 

Display Num